Paktank   Deer Park, TX

This project consisted of excavating and disposing of contaminated soil and placing 6" area paving, curbs and slag.

This resurfacing project was especially difficult due to the existing pipe rack that we had to hand excavate and pour concrete under. We also installed curbs around the existing tanks and pump foundations in order to contain chemical spills. A new storm sewer system was installed under the pipe rack as well using cast in place inlets and HDPE piping.

Below are the access ramps that were in stalled on both ends of the tank farm. A section of the existing retaining wall was removed, while still maintaining the integrity of the containment area during construction. Also shown below is the Slag installed on the outside of the paved areas.




Home | Up | Industrial & Municipal Projects | Cooling Tower Basin | Sludge Stabilization | Wastewater Storage | Temperature Reduction | Plant Site Upgrade | Compressor Foundation | Pumping Station | Microtunneling | Process Wastewater

Send mail to webmaster@grbirdwell.com with questions or comments about this website
Last modified: October 5, 2003