Turnkey construction of a seven basin (450’x55’) cooling tower structure.
All excavation, formwork, rebar installation, and concrete placement were
self –performed on the project.
Elaborate well pointing-system was used to install 14’ deep sump section
of the basin to handle excessive groundwater encountered 4’ below existing
grade. Concrete work was installed to the stringent ACI codes applicable to
water retaining structures. The work was performed with a strong emphasis
on adhering to the plant’s strict safety program.
|