EXXON USA COMPANY   Houston, TX

Exxon marketing has been upgrading their Distribution terminals and G.R. Birdwell Construction has been apart of 4 of these projects. The work was of a critical nature due to the potential hazards involved in working in a plant with continuous operations, and excavating around active fuel lines.

Our scope included upgrading the off spec product piping by removing the old piping and installing new piping above ground. Prior to beginning the rework of all containment areas, we located all existing underground pipelines. Once, elevation was verified the grades were modified and the dikes were raised, to increase their containment capacity. Rainwater drainage piping was installed with a monitoring station to check the water for possible contamination and all dikes were covered with limestone to ensure their durability




Home | Industrial & Municipal Projects | Cooling Tower Basin | Sludge Stabilization | Wastewater Storage | Temperature Reduction | Area Resurfacing | Compressor Foundation | Pumping Station | Microtunneling | Process Wastewater

Send mail to webmaster@grbirdwell.com with questions or comments about this website
Last modified: October 5, 2003